Production Planning & Control (PPC) and MRP Software in Pakistan
Turn every sales order and production order into a clear material and purchase plan. VapourPulse calculates material requirements, flags shortages, creates purchase requests and tracks every work order until dispatch.
From Order to Dispatch
One connected flow, so planning, purchase, production and stores all work from the same numbers.
Sales / Production Order
Customer orders, forecasts or production orders with quantities and dates.
MRP Run
BOMs exploded against stock, open purchases and work in progress.
Shortages
Exactly which materials are short, how much and by when.
Purchase
Purchase requisitions and POs created from shortages.
Work Orders
Production orders scheduled by stage, machine and shift.
Shop Floor
Material issue, output, scrap and labour recorded live.
QC & Dispatch
Quality checks, finished goods and delivery against the order.
PPC & MRP Features
Everything planners, purchase and production teams need, in one system.
Sales & production order MRP
Run MRP as per sales order for make-to-order, or as per production order for make-to-stock and stock builds.
Material requirement planning (MRP)
Multi-level BOM explosion that nets requirements against stock, reserved stock, open POs and WIP.
Shortage report
See every short material by order, quantity and required date before production starts.
Auto purchase requisitions
Create purchase requisitions and POs from MRP shortages in one click, respecting lead times and minimum quantities.
Master production schedule
Weekly and monthly production plan by product, line and plant.
Capacity planning
Load on machines, lines and shifts, so you can see bottlenecks before they happen.
Work orders and routing
Stage-wise work orders with routing, machines, operators and standard times.
Material issue and backflush
Issue material to work orders manually or automatically on output.
Shop floor tracking
Live status of every work order: planned, in progress, delayed or completed.
Scrap, rejection and rework
Record losses by stage and reason, and compare against standard.
Order-wise costing
Actual material, labour and overhead cost for every sales order and batch.
PPC dashboards
On-time delivery, plan vs actual output, efficiency and material shortages.
Material requirement as per sales order
When a sales order is confirmed, VapourPulse explodes the bill of materials for every item on the order, checks available stock, stock already reserved for other orders, open purchase orders and work in progress, and shows the net requirement for each material.
Planners see exactly what is short and by when, and can create purchase requisitions for all shortages at once. Material is then reserved for the order, so it is not used elsewhere.
Example: order for 500 ceiling fans
| Material | Required | Available | Short |
|---|---|---|---|
| Copper wire | 450 kg | 300 kg | 150 kg |
| Stampings | 500 sets | 620 sets | — |
| Capacitors | 500 pcs | 180 pcs | 320 pcs |
| Blades | 1,500 pcs | 1,500 pcs | — |
Illustrative example. Shortages become purchase requisitions in one click.
MRP for production orders
- Run MRP for a single production order or for all planned orders at once
- Requirement per order from its BOM, quantity and planned start date
- Multi-level: sub-assemblies create their own production orders
- Netting against stock, reservations, open POs and WIP
- Shortages become purchase requisitions or sub-assembly orders
- Material reserved and issued against the production order
MRP for production orders
Not all production starts from a sales order. For make-to-stock items, seasonal stock builds or internal requirements, planners create production orders directly, and VapourPulse runs MRP for each order.
The BOM of every production order is exploded level by level. Raw materials are checked against stock and open purchases, and semi-finished items generate their own production orders, so the whole chain is planned before the first machine starts.
Use MRP as per sales order for make-to-order business, MRP as per production order for make-to-stock, or both together in one plan.
Frequently Asked Questions
What is PPC in manufacturing?
Production Planning and Control (PPC) is the process of planning what to produce, when and on which resources, and then controlling execution on the shop floor so orders are delivered on time at the planned cost.
What is MRP?
Material Requirement Planning (MRP) calculates the raw materials and components needed for planned production by exploding bills of materials and netting them against stock, open purchase orders and work in progress.
Can VapourPulse plan material from sales orders?
Yes. Confirmed sales orders drive the MRP run, which shows required materials, current availability and shortages, and can create purchase requisitions for what is missing.
Can VapourPulse run MRP for production orders?
Yes. MRP can be run for a single production order or all planned orders. Each order’s BOM is exploded level by level, materials are netted against stock and open purchases, and shortages become purchase requisitions or sub-assembly production orders.
Does it support make-to-order and make-to-stock?
Yes. Make-to-order items are planned against specific sales orders, and make-to-stock items against forecasts and reorder levels.
Can we see machine and line capacity?
Yes. Work orders are loaded onto machines, lines and shifts, so planners can see capacity and move jobs before bottlenecks occur.
Which industries use PPC and MRP in VapourPulse?
Any manufacturer, including textile and garments, fans and electrical appliances, automotive parts, pharmaceuticals, food processing, plastics, furniture and engineering.
PPC & MRP for Your Industry
Plan production with confidence
See how VapourPulse plans material and production from your sales orders.
Book a Free Demo